Loading Events

« All Events

Gwynn Oak UMC Green Stormwater Infrastructure Information and Feedback Session

June 30 @ 6:00 pm - 7:00 pm

Please join Gwynn Oaks United Methodist Church in the design of a Green Stormwater Infrastructure (GSI) project slated to treat stormwater on the Church property and Howard Park Neighborhood. The aim of the project is to reduce downstream flooding in neighborhoods downstream neighborhood: Dickeyville, Wakefield, and West Forest Park that border the Gwynn’s Falls. Once the design is complete, construction is set to begin in Winter of 2025. BWB is hosting hosted an information session to seek feedback on the GSI design with the congregation and local community.

Click here for more information.

Details

Date:
June 30
Time:
6:00 pm - 7:00 pm
Event Category: